Mackay Ave | 02 Unit Conversion Support
London

Property Type: Existing Single-Family Dwelling
Scope of Work: Mid-Construction Consulting & Code Resolution for Legal Basement Unit
Project Overview:
This project highlights a common issue faced by many investors—hiring low-cost design firms that disappear when construction challenges arise. At Mackay Ave in London, Ontario, the investor had already received permit approval from another designer. However, once construction began and on-site issues were flagged by the building inspector, the original firm went completely unresponsive.
That’s when our team stepped in to help salvage the project. What seemed like a standard basement conversion quickly revealed serious complications with ceiling height compliance, which explained why the original firm likely walked away.
Scope & Strategy:
Conducted a full review of previously approved permit drawings
Completed a site visit and met with the building inspector to understand concerns
Identified Part 11 opportunities in the Ontario Building Code to avoid costly structural modifications
Developed a compliance path for the ceiling height deficiency, avoiding permit revocation
Provided detailed documentation and technical support for construction corrections
Guided the contractor through the modified scope with real-time architectural input
Challenges Solved:
Resolved a major ceiling height violation mid-construction without halting the project
Provided hands-on design and code guidance after the original firm abandoned the project
Used Part 11 allowances to reduce the burden of Part 9 requirements—saving significant time and money
Prevented permit cancellation and ensured continued progress on the legal 2-unit conversion
Investor Lessons & Benefits:
Reinforced the importance of working with design professionals who stay involved through construction
While the investor had to spend more to fix inherited issues, they avoided starting over entirely
We delivered a clear compliance path and became the bridge between inspector and contractor
Most importantly, the investor can now move forward with a legal basement unit—and future peace of mind
Current Status:
Construction changes are complete, permit compliance confirmed, and the unit is being finalized for tenant occupancy. Mackay Ave is now back on track.
Basement Suite, Design Takeover, Code Rescue, Dwelling

