Golfview Drive | 08 New Units

Collingwood

Golfview Drive | 08 New Units

Project Type: New Construction | Semi-Detached Building | 8 Residential Units
Lot Strategy: Severed from 1 Lot into 2

Project Overview:
This brand-new development project is a masterclass in as-of-right intensification and multi-unit design efficiency. Originally a single parcel, our team successfully severed the lot into two, allowing for the construction of a new 2-storey semi-detached building—with 4 legal residential units per side, for a total of 8 fully legal, self-contained units.

Each side of the semi features:

  • 2 Basement Units

  • 1 Ground Floor Unit

  • 1 Second Floor Unit
    All designed under current zoning without variances, making this project fully as-of-right and eligible for CMHC MLI Select financing.

Scope & Strategy:

  • Designed two mirror-image 4-plexes (one on each newly severed lot)

  • Achieved 8-unit total build with no variances and maximum zoning efficiency

  • Allocated 4 parking spaces per side (8 total) in compliance with local requirements

  • Coordinated layouts, energy performance, and accessibility targets to align with CMHC’s MLI Select program for premium financing benefits

  • Integrated full basement design to unlock lower-level units with code-compliant egress, light, and privacy

Challenges Solved:

  • Combined lot severance, density maximization, and parking compliance into a clean build plan

  • Optimized for long-term rentability, energy efficiency, and insurance compliance

  • Designed for MLI Select qualification—balancing accessibility, affordability, and sustainability metrics

Investor Benefits:

  • 8 brand-new, legal residential units ready for long-term financing and cash flow

  • Purpose-built for multi-tenant efficiency, reduced maintenance, and optimized NOI

  • Fully eligible for CMHC MLI Select program, providing up to 95% LTV and extended amortization

  • No rezoning or committee delays—construction to begin May 2025

Current Status:
Permit under review. Construction scheduled to start early May 2025.