Dells Cres | 02 Unit Conversion
Brampton

Property Type: Existing Single-Family Dwelling with Finished Basement
Scope of Work: Conversion of 580 sq. ft. Finished Basement into a Legal 1-Bedroom Unit
Project Overview:
This project involved the transformation of an existing 580 sq. ft. finished basement in Brampton into a fully legal 1-bedroom secondary dwelling unit. The basement space was efficiently divided to accommodate both the new rental unit and a private section retained by the homeowner for personal use.
Brampton’s walkout conditions added a unique technical challenge—requiring close collaboration with our structural engineer and contractor to verify the safety and compliance of the existing basement walkout. Fortunately, the structural conditions were confirmed to be sound, and the permit was promptly approved. Construction has since been completed.
Scope & Strategy:
Designed a compact yet functional 1-bedroom basement unit within 580 sq. ft.
Maintained a dedicated portion of the basement for the homeowner’s exclusive use
Verified the integrity of the existing walkout condition with onsite structural investigation
Secured building permit approvals under Ontario Building Code Part 9
Delivered full unit amenities including:
Kitchen
3-piece bathroom
Mechanical ventilation and shared HVAC
Legal egress and natural light
Avoided any exterior additions or zoning changes
Challenges Solved:
Coordinated on-site structural review to assess and approve existing basement walkout
Balanced homeowner access needs with tenant privacy through a split-basement layout
Navigated Brampton’s secondary unit guidelines for basement conversions
Achieved full code compliance without modifying the building envelope
Investor Benefits:
Legalized an existing finished basement to unlock rental income potential
Retained owner utility by preserving part of the basement for personal use
Reduced risk through structural due diligence and signed engineering approvals
Improved property value and cash flow without major construction costs
Current Status:
Construction is complete. The unit is now ready for occupancy and generating rental income.
Basement Conversion, Legal Secondary Unit, Split-Use Layout Design